a power plant. The project has been divided into two phases, of which the first is currently underway. Phase 1 consists of, inter alia, 4 generators, totalling 1500kW/1875kVA Continuous power, with fuel tanks, overhead lines, 4000kVA Step-up transformer.Ongoing – June 2015